Documents

UFC 3-250-06 Repair of Rigid Pavements Using Epoxy Resin Grouts, Mortars and Concretes (01!16!2004)

Description
UFC 3-250-06 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) REPAIR OF RIGID PAVEMENTS USING EPOXY RESIN GROUTS, MORTARS, AND CONCRETES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UFC 3-250-06 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) REPAIR OF RIGID PAVEMENTS USING EPOXY RESIN GROUTS, MORTARS, AND CONCRETES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the c
Categories
Published
of 18
18
Categories
Published
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Transcript
  UFC 3-250-0616 January 2004 UNIFIED FACILITIES CRITERIA (UFC) REPAIR OF RIGID PAVEMENTSUSING EPOXY RESIN GROUTS,MORTARS, AND CONCRETES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED  UFC 3-250-0616 January 2004 1  UNIFIED FACILITIES CRITERIA (UFC)REPAIR OF RIGID PAVEMENTS USING EPOXY RESIN GROUTS, MORTARS, ANDCONCRETES Any copyrighted material included in this UFC is identified at its point of use.Use of the copyrighted material apart from this UFC must have the permission of thecopyright holder.U.S. ARMY CORPS OF ENGINEERS (Preparing Activity)  NAVAL FACILITIES ENGINEERING COMMANDAIR FORCE CIVIL ENGINEER SUPPORT AGENCYRecord of Changes (changes are indicated by \  1  \ ... /  1  /) Change No. Date Location This UFC supersedes TM 5-822-9, dated 20 January 1989. The format of this UFC does notconform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision.The body of this UFC is the previous TM 5-822-9, dated 20 January 1989.  UFC 3-250-0616 January 2004 2 FOREWORD  \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and providesplanning, design, construction, sustainment, restoration, and modernization criteria, and appliesto the Military Departments, the Defense Agencies, and the DoD Field Activities in accordancewithUSD(AT&L) Memorandumdated 29 May 2002. UFC will be used for all DoD projects andwork for other customers where appropriate. All construction outside of the United States isalso governed by Status of forces Agreements (SOFA), Host Nation Funded ConstructionAgreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.)Therefore, the acquisition team must ensure compliance with the more stringent of the UFC, theSOFA, the HNFA, and the BIA, as applicable.UFC are living documents and will be periodically reviewed, updated, and made available tousers as part of the Services’ responsibility for providing technical criteria for militaryconstruction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval FacilitiesEngineering Command (NAVFAC), and Air Force Civil Engineer Support Agency (AFCESA) areresponsible for administration of the UFC system. Defense agencies should contact thepreparing service for document interpretation and improvements. Technical content of UFC isthe responsibility of the cognizant DoD working group. Recommended changes with supportingrationale should be sent to the respective service proponent office by the following electronicform:Criteria Change Request (CCR). The form is also accessible from the Internet sites listedbelow.UFC are effective upon issuance and are distributed only in electronic media from the followingsource: ã Whole Building Design Guide web sitehttp://dod.wbdg.org/  . Hard copies of UFC printed from electronic media should be checked against the currentelectronic version prior to use to ensure that they are current. AUTHORIZED BY:  ______________________________________ DONALD L. BASHAM, P.E.Chief, Engineering and ConstructionU.S. Army Corps of Engineers ______________________________________ DR. JAMES W WRIGHT, P.E.Chief EngineerNaval Facilities Engineering Command    ______________________________________ KATHLEEN I. FERGUSON, P.E.The Deputy Civil EngineerDCS/Installations & LogisticsDepartment of the Air Force ______________________________________ Dr. GET W. MOY, P.E.Director, Installations Requirements andManagementOffice of the Deputy Under Secretary of Defense(Installations and Environment)    ARMY TM 5-822-9AIR FORCE AFM 88-6, Chap. 10DEPARTMENTS OF THE ARMYAND THE AIR FORCETECHNICAL MANUAL REPAIR OF RIGID PAVEMENTS,USING EPOXY RESIN GROUTS,MORTARS, AND CONCRETES DEPARTMENTS OF THE ARMY, AND THE AIR FORCEJANUARY 1989
Search
Tags
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x