1. Mine file No : RAJ/JHN-4/CU- 2 (i) Name of the Inspecting : Officer and ID No. (ii) Designation : (iii) Accompaning mine : Official with Designation (iv) Date of Inspection INDIAN BUREAU OF MINES MINERALS
Categories
Published
of 12
0
Categories
Published
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Transcript
1. Mine file No : RAJ/JHN-4/CU- 2 (i) Name of the Inspecting : Officer and ID No. (ii) Designation : (iii) Accompaning mine : Official with Designation (iv) Date of Inspection INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION (a) Mine Name : KOLIHAN Ajmer regional office S012 ( ) Sharma H.C. Sr. Asst. Contrl. Mines : 06-AUG-18 (v) Prev.inspection date : 30-NOV-17 (b) Registration NO. : (g) First opening date : 24-NOV-66 PART-I : GENERAL INFORMATION (c) Category : A Mechanised (d) Type of Working : Underground (e) Postal address State : RAJASTHAN District : JHUNJHUNU Village : KOLIHAN NAGAR/KHETRI Taluka : KHETRI Post office : KHETRI Pin Code : FAX No. : Phone : (f) Police Station : (h) Weekly day of rest : SUN 2. Address for : correspondance MCDR INSPECTION REPORT Sh. Gopal Rathi, Sh. U B Bhatt IBM/6381/2011 Khetrinagar HINDUSTAN COPPER LIMITED, KOLIHAN NAGAR, PO KHETRI Mine code : 14RAJ (a) Lease Number : RAJ0451 (b) Lease area : (c) Period of lease : 20 (d) Date of Expiry : 23-NOV Mineral worked : COPPER ORE Main 2 5. Name and Address of the Lessee : Owner : Agent : Mining Engineer Name : Qualification : Appointment/ : Termination date Geologist Name : Qualification : Appointment/ : Termination date Manager Name : Qualification : Appointment/ : Termination date HINDUSTAN COPPER LIMITED KHETRI COPPER COMPLEX KHETRI NAGAR JHUNJHUNU RAJASTHAN Phone: FAX : Shri S.K. Bhattacharya 1-Ashutosh Chowdhury Avenue Kolkata JHUNJHUNU RAJASTHAN Phone: FAX : Shri R.K. Shah Khetri Copper Complex M/s Hindustan Copper Limited Khetri Nagar, Jhunjhunu JHUNJHUNU RAJASTHAN Phone: FAX : Mr. U.B. Bhatt,Full Time BE Mining 13-MAY-13 Dr. Gopal Rathi,Full Time M.Sc. & Ph.D.(Geology) 19-JUN-15 Mr. S.D. Sharma B.E. Mining 01-JUN Date of approval of Mining : Existing rule 11 MCDR1988 Plan/Scheme of Mining Mining Scheme rule 12 MCDR1988 Mining Scheme rule 12 MCDR1988 Modif.approved Mining Scheme Mining Scheme rule 12 MCDR1988 Renewal under rule 24 MCR1960 MP modif under 17(3) MCR JUN NOV JUN JAN JUL APR MAY-18 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of previous year 2400 mts 546 mts 1b Exploration over lease area for geological axis 1 or 2 64mRL m, Total 2400m 64mRL-350m, 0mRL- 196m; Total m 1c Exploration Agencies and Expenditure in lakh rupees during the year M/S Asha Engineering, Rs lacs during ,Rs Lacs during M/S Asha Engineering, Rs lacs during ,Rs. 15 Lacs during till d Balance area to be explored to bring Geological axis in 1 or 2 1e Balance reserve as on 01/04/ MT x 1.34 % as on 1/4/ MT x 1.34 % 1f officers on geology, exploration etc Not applicable The deviation in exploration proposals has been pointed out as VL. Development : 2a 2b 2c 2d Location of development w.r.t.lease area Separate benches in topsoil, overburden and minerals (Rule 15) Stripping ratio or ore to OB ratio Quantity of topsoil generation in m3 FY mRL- NA, 124mRL- 90m,64mRL- 2910m,0mRL- 0m, III Phase- 500m, Total 3500m as it is U/G Mine 184mRL- 146m, 124mRL m, 64mRL- 48.1m,0mRL- 17.1m, Total 633.6m 4 2e Quantity of overburden generation in m3 2f officers on development of pit w.r.t. type of deposit etc The development was not carried out as per proposal for which VL has been pointed out. Exploitation: 3a 3b 3c 3d 3e 3f 3g 3h 3i Number of pit proposed for production Quantity of ROM mineral production proposed Recovery of sailable/usable mineral from ROM production Quantity of mineral reject generation Grade of mineral rejects generation and threshold value declared. Quantity of sub grade mineral generation. Grade of sub grade mineral generation Manual / Mechanised method adopted for segregating from ROM Any analysis or beneficiation study proposed and carried out for sub grade mineral and rejects. 16- stope blocks T 90 % as as as as Mechanized 6 stopes T 90% Mechanized 5 3j 3k 3l 3m 3n 3o 3p 3q Provision of drilling and blasting in mineral benches Provision of mining machineries in mineral benches Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM Total area covered under excavation/pits Ore to OB ratio for the pit/mine during the year. Total area put in use under different heads at the end of year Production of ROM mineral during the last five year period as applicable officers on method of mining etc. as as as as ha T, T, T, T, T ha T, T, T, T, T The mine had been developed as Under ground mine suitable to such type of deposit. Solid Waste Management - Dumping: 4a Separate dumping of topsoil, OB and mineral rejects (Rule 32,33) No Top soil,waste in U/G Cu M Waste in U/G Cu M 6 4b 4c 4d 4e 4f 4g 4h 4i 4j 4k Location of topsoil, OB and mineral reject dumps Number of dumps within lease area and outside of lease area Location of dumps w.r.t. ultimate pit limit (Rule 16) Number of active and alive dumps. Number of dead dumps. Number of dumps established. Whether Retaining wall or garland drain all along dumps are there. Length of Retaining wall or garland drain all along dumps Number of settling ponds Specific comments of inspecting officer on waste dump management as it is U/G mine. 2 nos Not specified 1 no Nil 01 nos yes 2 nos 1 no 01 nos. yes Retaining wall 292 m,garland drian- 147m No issue to the dumping of waste as it is U/G mine. Solid Waste Management - Backfilling: 5a Status of part or full extraction of mineral from mined out area before starting backfilling. No Proposal as it is Under ground mine. 5b Area under backfilling of mined out area 7 5c 5d 5e Concurrent use of topsoil for restoration or of mineral out area (Rule 32) Total area fully reclaimed and rehabilitated officers on backfilling and reclamation etc. Nil as it is U/G mine. It is U/G mine & backfilling is not applicable. Progressive Mine Clousre Plan: 6a 6b 6c 6d 6e 6f 6g 6h Whether Annual report on PMCP submitted on time and correctly. Rule 23 E(2). Area available for (ha). afforestation done (ha). No. of saplings planted during the year Cumulative no.of plants Any other method of Cost incurred on watch and care during the year Compliance on reclamation and by backfilling (i) Voids available for backfilling ( Lx B x D Yes as it is U/G mine ha 400 no s Not specified Old worked out stopes Yes Submitted 0.20 ha 400 nos 2400 nos Old worked out stopes St 606 S 8 6i 6j 6k 6l 6m 6n 6o 6p Compliance on reclamation and by backfilling (ii) Voids filled by waste / tailings Compliance on reclamation and by backfilling (iii)afforestati on on backfilled area Compliance on reclamation and by backfilling (iv) Rehabilitation by making water reservoir Compliance on reclamation and by backfilling (v)any other specific means. Compliance of of waste land within lease (i)afforestation Compliance of of waste land within lease (ii)area (ha) Compliance of of waste land within lease (iii)method of Compliance of environmental monitoring (core zone and buffer zone) Yes Old mined out stopes. as mine being U/G Mine. No Proposal Regular monitoring of various parametters. Being done Being done 9 6q officers on PMCP compliance and progressive closure operations etc. The Lessee's conduct towards implementation of PMCP proposals was satisfactory. Mineral Conservation: 7a ROM Mineral dispatch or grade-wise sorting within lease area All the ROM is processed at their own concentrater plant. 7b Method of gradewise mineral sorting i.e. manual or mechanical. 7c Different grade of mineral sorted out at mines. 7d Any beneficiation process at mines. The beneficiation is carried out at their own concentrator plant. 7e officer on Mineral conservation and beneficiation issues The beneficiation of ore for improvement of grade is carried out at their own concentrator plant. Environment: 8a 8b Separate removal and utilization of topsoil (Rule 32) Concurrent use or storage of topsoil as it is U/G mine. No Proposal as no surface landscape has been changed. 10 8c 8d 8e 8f 8g 8h 8i Separate dumps for overburden, waste rock, rejects and fines (Rule 33) Use of overburden, waste rock, rejects and fines dumps for restoring the land to its original use Phased restoration, reclamation and of lands affected by mining operations (Pits, dumps etc) Baseline information on existence of plantation and additional plantation done (Rule 41) Survival rate Water sprinkling on roads to control airborne dust officer on aesthetic beauty in and around mines area Separate dump for waste. of O/B, top soil generation. 400 saplings proposed on stabilised dump area. 30 to 40 % Yes proposad. Being done Being done 40%. Regular water sprinkling is done on road, Stock pile & Ore transfer point. The general aesthatic beauty in & around mine was good. Compliance of Rule 45: 9a Status of submission of Monthly and Annual returns M/R Submitted up to September A/R Submitted for 11 9b 9c 9d 9e 9f 9g 9h 9k Annual return for information on Mining Engineer, Geologist and Manager land use pattern for area under pits, reclaimed area, dumps etc. afforestation mineral reject generation (Grade and quantity) ROM stock and/or graded ore sale value, Ex. Mine price and production cost fixed assets mining machineries Sh. S. D. Sharma- Manager, Mining Engineer- Sh.U. B. Bhatt,Geologis t- Sh.Gopal Rathi. Used in waste ha, Occupied by plant, Building etc ha, Others ha Number of Trees 200 within lease & 200 in outside lease area with survival rate of 30 %. Mineral Rejects Generation - Nil. Grade- The opening Stock T, Production T, Closing Stock T. Ex Mine Price Rs. per tonne. cost of production- Rs per tonne for captive consumption. The Fixed assests Rs /- Details furnished in list of M/C's used. Found in order 12 Details of violations observed during current inspection and compliance position of violation pointed out Violation observed Show couse position Rule NO. Issued on Compliance on Rule NO. Issued on Compliance on MCDR17 Rule 11(1) MCDR17 Rule 19(1) 27-AUG AUG OCT OCT-18 Date : (Sharma H.C.) Indian Bureau of Mines
Search
Similar documents
View more...
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x