Prepared Approved Date: 18/08/14 Date: 18/08/14 QA/QC Manager Project Director RECORD OF MODIFICATIONS Rev. Section Modified Description of the modification Date 00 INITIAL ISSUE FOR ENGINEER REVIEW AND APPROVAL 18/08/2014 Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman COWI & Partners LLC Direct
Categories
Published
of 6
496
Categories
Published
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Similar Documents
Share
Transcript
    Prepared Approved Date: 18/08/14 Date: 18/08/14 QA/QC Manager Project Director RECORD OF MODIFICATIONS   Rev. Section Modified Description of the modification Date 00 INITIAL ISSUE FOR ENGINEER REVIEW AND APPROVAL 18082014 Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman   COWI & Partners LLC Directorate General of Roads & Land Transport P.O.Box2115, P.C.112 Sultanate of Oman   Khalid Bin Ahmed & Sons LLC –  CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman   CONTRACT No.: 95/2012 BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2   METHOD STATEMENT CLEARING AND GRUBBING DOCUMENT No.: KAS-CC JV/BS2P2/MS/QA/002    Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman   COWI & Partners LLC Directorate General of Roads & Land Transport P.O.Box2115, P.C.112 Sultanate of Oman   Khalid Bin Ahmed & Sons LLC –  CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman   Contract No.: 95/2012 BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2   DOCUMENT No: KAS-CC JV/BS2P2/MS/QA/002 METHOD STATEMENT CLEARING AND GRUBBING Date: 18/08/2014 Form No.: KAS-CC JV/BS2P2/OP/QA/01.04 Page 2  of 6   TABLE OF CONTENTS   1   PURPOSE ............................................................................................................ 3   2   SCOPE ................................................................................................................ 3   3    APPLICABLE DOCUMENTATION ......................................................................... 3   4   RESOURCES........................................................................................................ 3  4.1 PLANT AND EQUIPMENT .............................................................................................. 3 4.2 MANPOWER ................................................................................................................ 3 5   MATERIALS ........................................................................................................ 4   6   DESCRIPTION .................................................................................................... 4  6.1 SETTING OUT OF RIGHT OF WAY ................................................................................. 4 6.2 SITE CLEARING WORKS ............................................................................................... 4 6.3 DIVERSION AND PROTECTION OF SERVICES ................................................................ 5 6.4 TRAFFIC MANAGEMENT AND MONITORING. .................................................................. 6 7   QUALITY ASSURANCE ........................................................................................ 6   8   HEALTH AND SAFETY ......................................................................................... 6   9   ENVIRONMENT ................................................................................................... 6   10   RECORDS ........................................................................................................... 6   11    APPENDICES ...................................................................................................... 6      Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman   COWI & Partners LLC Directorate General of Roads & Land Transport P.O.Box2115, P.C.112 Sultanate of Oman   Khalid Bin Ahmed & Sons LLC –  CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman   Contract No.: 95/2012 BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2   DOCUMENT No: KAS-CC JV/BS2P2/MS/QA/002 METHOD STATEMENT CLEARING AND GRUBBING Date: 18/08/2014 Form No.: KAS-CC JV/BS2P2/OP/QA/01.04 Page 3  of 6   1   P URPOSE   This Method Statement describes removal and satisfactory disposal of all vegetation, surface debris and scattered stones and rocks within the limits of the actual road width (including the toes of fill and cut slopes and an additional 5m wide band from both sides), easement areas and borrow pits. 2   S COPE This Method Statement covers the clearing and grubbing and topsoil management for all construction sites associated with the construction of Dualization of Bidbid-Sur Road, Section 2, Part 2 Project. 3    A PPLICABLE D OCUMENTATION      Contract Documents    Sultanate of Oman. Standard Specifications for Roads & Bridge Construction    Quality Management Plan    Safety and Environmental Plan    Organizational Procedure KAS-CC JV/BS2P2/OP/QA/001 of CONTROL OF QUALITY DOCUMENTATION  AND RECORDS    Method Statement KAS-CC JV/BS2P2/MS/QA/001 SURVEY CONTROL 4   R  ESOURCES   4.1   P LANT AND E QUIPMENT   The equipment to be used in both net calculation and net execution shall be as follows:    Excavators    Dozers    Trucks    Water trucks     Vibrating rollers 4.2   M  ANPOWER       Site supervisor    Excavator driver    Dozer driver    Ministry of Transport & Communications Directorate General of Roads & Land Transport P.O.Box27, P.C.114 Sultanate of Oman   COWI & Partners LLC Directorate General of Roads & Land Transport P.O.Box2115, P.C.112 Sultanate of Oman   Khalid Bin Ahmed & Sons LLC –  CORSAN CORVIAM JV Al Azaiba P.O. Box723, P.C.130 Sultanate of Oman   Contract No.: 95/2012 BS2P2 - Dualization of Bibbid-Sur Road, Section 2, Part 2   DOCUMENT No: KAS-CC JV/BS2P2/MS/QA/002 METHOD STATEMENT CLEARING AND GRUBBING Date: 18/08/2014 Form No.: KAS-CC JV/BS2P2/OP/QA/01.04 Page 4  of 6      Truck driver    Roller driver    Labourers 5   M  ATERIALS      Steel rod with a 10-15 cm diameter steel disc attached to its end, plate compactor or mechanical tamping rammer    Signals    Barriers    Traffic cones    Caution tape    Picks    Shovels 6   D ESCRIPTION   6.1   S ETTING O UT OF R  IGHT OF W  AY    Prior to the commencement of the works the setting out of the right of way shall be carried out by the qualified Surveyor to ensure the extent of which the site clearance works is required. Setting out will be made in accordance to Method Statement KAS-CC JV/BS2P2/MS//QA/001 SURVEY CONTROL. 6.2   S ITE C LEARING W ORKS   Engineer will be asked to designate all trees, shrubs, plants, vegetation, etc and other items that are to remain within the right-of-way (ROW). All such items shall carefully preserve from damage or defacement. Trees to be removed and delivered for replanting shall be carefully handled. Should it requires to be removed and demolished, then the Public Relations Officer (PRO) in cooperation with Site Engineer shall arrange for the demolition and tree removal permit to the relevant Authority.  All surface objects, trees, stumps, roots, stones and rocks (up to 0.2 m 3  or 500 kg individual size or weight), and other protruding obstructions not designated to be retained shall be cleared or grubbed to ground level. Nonperishable solid objects (such as boulders, rocks, concrete blocks, etc.) which will be a minimum of 2 m below the sub-grade or finished ground level may be left undisturbed at the Engineer’s discretion. If such nonperishable objects are encountered within 2m below the sub-grade or finished ground level, they will be removed and considered as unsuitable material.
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x