Slides

byresh resume-1 - Copy

Description
1. Byresh.N C/o Teresa, Ananda nivas Contact: +91-9886262190 # 94, 5th cross, Shammanna layout E-mail –byresh.90@gmail.com Gottigere, Bannerghatta road, Bangalore,…
Categories
Published
of 6
66
Categories
Published
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Similar Documents
Share
Transcript
  • 1. Byresh.N C/o Teresa, Ananda nivas Contact: +91-9886262190 # 94, 5th cross, Shammanna layout E-mail –byresh.90@gmail.com Gottigere, Bannerghatta road, Bangalore, Karnataka-560083 Professional Objective: A position that enables me to enrich my knowledge and skills while contributing my best to the organization and feel satisfied. Executive Summary: 4+ years of Experience in ECM (Engineering Change Management), Admin work of PLM and PR system and NPI team. • Served as an integral member of Change Analyst Forum through ECR process. • Participated as member of cross functional process improvement team addressing CRB approval. • ECO implementation considering CCB chapter by increasing productivity. • Maintain BOM and attributes by regular cross verification with TPL and drawings/spec. • Maintaining updated data base input with multiple source. • Ensure correct and complete asset information for all projects. • Worked on PLM Admin and PR Admin stuffs. Organization Details: From April 2015 to now Rapid Global Business Solutions, Banglore. (Client LAM-Research) as Engineering Change Analyst in Engineering Services Dept. Roles and Responsibilities: • Responsible for analyzing the ECR to ensure it meets business process requirements, auditing for accuracy and completeness of the change, setting track, initiating the Financial Impact. • Perform documentation research for all parts/assemblies to be included in the Engineering change package to ensure accuracy, completeness, and adherence to change control policies, procedures and design drafting standards. Provides recommendations, makes decision, and or/escalate based upon the needs of the situation. • Manages Urgent ECRs through the life cycle. • Updates and maintain all master and current document files with latest revision drawing/documents provided. • Maintaining BOM attributes through SAP -PLM software for new change.
  • 2. • Identifies potential Urgent Changes and advises owner about Urgent Change process. • Maintain accurate records in the data management system (Fast track / Full track). • Works with other functional groups to attain and compile all pertinent documentation and deliverables for the Engineering Change package and places them in the Company's PLM/SAP system. • Actively participate in cross-functional meetings focused on discussing Engineering Changes. Participation consists, but is not limited to, providing Engineering Change package issues, assigning problem solving action items and verifying completion of the action items before the Engineering Change package is processed system. • Interface with cross-functional groups specifically Product Management, Engineering, Manufacturing, Materials, Spares, Manufacturing Engineering, Supplier Engineering, etc to provide review notification and receive deliverables and approval documentation. • Updates the modify log with all progress. • Reviews implemented Changes to ensure they have met their objectives. • Reviews Post Implementation Reviews within assigned areas to ensure completeness. • Responsible for processing and implementation. • Documenting minutes of CRB meetings. • Schedule, train and manage conducting of BOM audits by internal CFT. • Assist in quoting process for new and changed parts. PLM Admin, PR Admin and Doc-control helpdesk works: • Attending request mails and troubleshooting errors regarding BOM and PLM issues. • Document correction in SAP-PLM as per released Drawing/Spec. • Legacy part creation and maintaining its BOM attributes. • Redistribution Package creation for change in material affectivity strategy. • Re-creation of work flow and validating version of revisions in SAP-PLM. • Released document corrections having typos in PLM. • Work flow distribution in PRs and changing Key characteristics of PR report. Since DEC-2013 to JAN -2015 Sri Ganesh Industries, Bangalore. Production Engineering Dept as an Engineering Supervisor (NPI Team). Roles and Responsibilities: • Responsible for Successful Introduction of the New Products and Engineering change from the defined customer account into the Production. • Study the ECOs / Drawings closely and coordinate with the CFTs. • Release Part list to production for new models & after implementation of ECO's • Efficiently managing ECOs for manufacturing sites. • Successfully implement any engineering changes on the product during its life cycle. • Coordinates ECO status with customer and implements cost changes and effective dates. • Single point of contact with customers to ensure that customer requirements are successfully realized in the product.
  • 3. • Smooth ramp up from proto to mass / serial production. • Optimize and maintain the yield, cost of the product throughout the product lifecycle. • Reviewing and analyzing the customer product requirements with respect to the production capabilities, identifying the requirements and gaps. • Collaborating with customers and program management to address the gaps and clarifications to meet the product requirements. • Analyzing and maintaining the BOM in the ERP to enable procurement of the materials. • Defining the manufacturing process to meet all customer requirements. • Initiating and working with CFT to perform product FMEAs and defining Control Plans. • Identifying, defining and procurement of all critical tools and fixtures required to realize the product. Since APRIL -2012 to SEP -2013 TATA Marcopolo Motors Limited, Dharwad. Process Engineering Dept (ECM Team), as a GET and Team leader. Roles and Responsibilities: • Involving in DMLs (Design Modification List) study of feasibility and executation. • Design study for the product which has been modified. • Coordinating with internal dept for the change request implementation. • Maintaining BOM attributes through SAP -PLM software for new change. • Taking tryout and checking the feasibility of the change request. • After releasing of MBPA updating change activity in BOM. • Maintain proper documentary for change activity • Investment Analysis and cost impactness for the change activity. • Creating project timetable of phases and milestones of implementation. • Tabulating and assessment of current and potential change management issues. • BOM Validation through SAP –PLM v/s TPL and Drawing/Spec by giving feedback for necessary changes • Involved in the improvements of Engineering change management system • Implementation and regularizing the change activity in Production. • Maintaining Tracking records for each and every individual flow • Adept and executing the work involved in Industrial Engineering Activity/ Cost reduction, interacting with internal department for project execution. • Designing of cutting and marking templates using Auto cad and Solid works • Involving in Material audit to maintain miss match in physical and BOM consumption of product Software Knowledge: • CAD: Solid works, Auto-CAD, Pro-E. • EXECUTION: SAP- PLM, MS-office.
  • 4. Educational Details: • Bachelor of Engineering (Mechanical) from GEC-RAMANAGAR, graduated in 2011. • PUC from DVS COMPOSITE PU COLLEGE- SHIMOGA, qualified in 2007. • SSLC from DVS COMPOSITE HIGH SCHOOL-SHIMOGA, completed in 2005. ACHIEVEMENTS: • Success implemented 1200 ECR’s • Created new group for ECM • Successfully involved in creating GMPA for the new activity • Below tab shows Six sigma yellow belt method of problem solving techniques for problem caused Personal information: Date of Birth: 26 April 1989 Permanent Address: Father Name: Nanjundappa N Byresh.N, s/o Nanjundappa .N, Nationality: Indian Shivashankara Nilaya, #124/3 PAN card: BKIPB5971L Maruthi Extension, Passport number: M1594216 Savalanga road, Navile, Languages known: English, Kannada, Hindi Shimogga, Karnataka-577201 Designed part Problem Caused Key results Cowl Bus wiper mounting bracket Fitment issue and also inventory 16 lack cost saved for the company A-Pillar checking Template Fitment issue Rework cost of 1000 rs per bus saved SLB for 34WB PKD Fitment issue Electrical harness of rs 200 saved per PKD
  • 5. Declaration: I hereby, declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars Yours Sincerely DATE: PLACE: Banglore (BYRESH.N)
  • 6. Declaration: I hereby, declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars Yours Sincerely DATE: PLACE: Banglore (BYRESH.N)
  • SAP SD Summary -1

    Jul 26, 2017

    12-17668 #260

    Jul 26, 2017
    We Need Your Support
    Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

    Thanks to everyone for your continued support.

    No, Thanks
    SAVE OUR EARTH

    We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

    More details...

    Sign Now!

    We are very appreciated for your Prompt Action!

    x